About Us

Employment Opportunities

Site Assessment

Risk Assessment and Toxicology

UST Services

Environmental Modeling

General Contracting and Field Services

Environmental Remediation

Water Resources

FTP Login

Employee Login
UST Services

ETIC Engineering's in-house staff of scientists, geologists, engineers, and environmental contracting specialists provide a full array of Underground Storage Tank Services, including:

  • The removal of underground storage tanks
  • Performance of site investigations and evaluation of potential contamination from hazardous materials and petroleum products
  • Preparation and submission of Phase I and Phase II reports and Corrective Action Plans
  • The creation of remedial designs and acquisition of all necessary regulatory permits (NPDES, AQMD, POTW, various building permits)
  • Source removal by excavation
  • Construction and maintenance of soil and groundwater remediation systems
  • Risk assessment and groundwater modeling
  • Regulatory negotiations for site closure
  • Implementation of ETIC's Portfolio Management approach to assist clients in the management of both fiscal and technical aspects of a large portfolio of sites
In addition, ETIC is in the process of performing unique research in the evaluation of the natural degradation of fuel oxygenates.

UST Reimbursement Fund

With the growing concern over MTBE and other fuel oxygenates, UST owners or Responsible Parties have grown more aware of the UST Reimbursement Fund as a valuable resource. Since its inception, ETIC has assisted numerous property and UST owners in the process of obtaining reimbursement for these assessment and remediation efforts. The Fund, maintained by the California State Water Resources Control Board, offers property and tank owners up to $1.5 million for the cleanup of leaking USTs. ETIC staff assists UST Fund claimants in obtaining pre-approvals, 3-bid waivers, and preparation of Fund-compliant invoices.

Our UST Services include:

  • UST Fund SB2004 Reimbursement Program Assistance
  • Project Lifecycle Management Services: Complete Fiscal & Technical Management of Multiple Sites
  • Investigation, Remediation, & Reporting
  • Negotiations & Closure

Pleasant Hill Office
2285 Morello Ave.
Pleasant Hill, CA 94523
Map of Office
Tel: 925-602-4710
Fax: 925-602-4720
Martinez Office
4851 Sunrise Drive, Suite 102
Martinez, CA 94612
Map to Office
Tel: 925-370-8800
Fax: 925-370-8700
Pasadena Office
898 Fair Oaks Blvd. Suite A
Pasadena, CA 91103
Map to Office
Tel: 626-432-5999
Fax: 626-432-5998
Costa Mesa Office
3303 Harbor Blvd., Suite E-8
Costa Mesa, CA 92626
Map to Office
Tel: 714-549-2301
Fax: 714-549-2303
San Diego Office
8665 Gibbs Drive, Suite 204
San Diego, CA 92123
Map to Office
Tel: 619-420-9600
Fax: 619-420-9601

Copyright © ETIC Engineering, Inc


ETIC Web Mail